Pontiac B5 - Child Services Building
This was a 138,355 s.f. improvement to an existing 1-story building. The building had previously been a Costco store. The project was to remove the existing interior improvements, leaving only the structure and shell, and construct office improvements throughout the building. These improvements include new walls, doors, ceilings, and associated mechanical, plumbing, electrical, and structural work. The exterior walls were structurally modified to cut new window openings and received new finishes, so the building reads as an office building. The rooftop received new mechanical equipment and solar panels.
Key highlights
- Size: 138,000 sq.ft.
Location
Clovis, CA
Project team
Architect: Arc Tech, Inc.